2008-05, ZPW2000 test station was put into use in wenfu line, wuguang line and zhengxi line
In May 2008, the new product ZPW2000 passenger dedicated line test bench was developed and put into use in wenfu line, wuhan-guangzhou passenger dedicated line and zhengzhou-west passenger dedicated line